Quoting · Written tutorial · 5 min read

Machine, gas and electricity profiles

Save reusable customer, machine and utility settings for future quotations.

Updated October 9, 2026 · Based on the current Ovrendi workflow

Who can save standards

Owners and admins can save shared profiles. Managers can prepare quotes using available settings. Profiles are your shop’s assumptions, not manufacturer-certified standards.

Machine settings

Use the operating cost per hour and separate setup or labor time where applicable. Processing time comes from the imported report. Electrical input is different from the laser’s optical output rating.

Bottle or bottle-pack gas

Enter the pack price, bottles per pack, supplier-stated standard cubic metres per bottle and usable percentage. Use gas volume, not cylinder water capacity. Enter cutting and piercing flow in standard litres per minute using the same standard-volume convention.

Other gas choices

You may use a price per standard cubic metre or a manual job charge. Additional gas-on seconds use cutting flow. Travel does not automatically add gas. If included elsewhere or excluded, enter a clear reason.

Electricity

Enter average electrical input in kW and price per kWh. The estimate uses processing plus setup time. Include auxiliary equipment once. Alternatively enter a manual charge, or state where electricity is already included.

Save and reuse

Under Save reusable standards choose the profile type, optional customer and machine associations, and a meaningful name. Select Save new profile. To reuse it, choose Saved profile → Load profile. Review the applied fields. Saved quote revisions retain their original snapshots.